1

2023

Tenaga Nasional Berhad Motive Engineering Sdn. Bhd.
Kerja- Kerja Penambahan Switchgear 11kV AIS di TNB PPU TAPU
Provide engineering design services and supply loose components for extension of 11kV Underground CRP at PPU 33/11kV Taman Industri Puchong
Malaysia
Tenaga Nasional Berhad MN Power Transmission Sdn. Bhd.
Supply And Erect of Capacitor Bank & Associated Civil Works for: Mainhead II: 1×30 MVAR Capacitor Bank at PMU 132kV Mergong, Kedah
Engineering, design, supply of 132kV CRP and telecontrol equipment for Shunt Capbank bay (IEC61850) at PMU 132/33/11kV Mergong
Malaysia
Tenaga Nasional Berhad
Supply, Install & Commissioning of RTCC For Grid Maintenance, Grid Division – Mainhead 2 (North)
Engineering, design, supply of 273/132kV Digital RTCC (IEC61850 Hybrid RTU) at PMU 275/132/33kV Bukit Merah
Malaysia
Tenaga Nasional Berhad ETD Makmur (M) Sdn. Bhd.
Replacement And Refurbishment Primary & Secondary For Mainhead I: PMU 132/33kV Air Hitam (AIS), Selangor
Engineering, design, supply of 132kV CRP and telecontrol equipment (IEC61850 Hybrid RTU) at PMU 132/33kV Air Hitam and retrofitting works at Remote Ends
Malaysia
Tenaga Nasional Berhad ETD Makmur (M) Sdn. Bhd.
Extension of 2 X UGC Bays And Associated Civil Works For: Mainhead II: PMU 275kV Sedenak, Johor
Engineering, design and supply of 275kV CRP (UCF, BBLI, MK, WAIS) and retrofitting of existing 275kV HI Busbar Protection Panel at PMU 275kV Sedenak
Malaysia
Tenaga Nasional Berhad Pembinaan Terasmaju Sdn. Bhd.
Establishment of New PMU 275kV Bersia (GIS), Perak
Engineering, design and supply of 275kV secondary, 275kV Telecontrol equipments, integration of IEC61850 system at PMU 275kV Bersia and retrofitting works at PMU 275/132kV Bukit Tengah and PMU 275/33kV Temenggor
Malaysia
Tenaga Nasional Berhad MTM Sdn. Bhd.
Kerja Pembekalan, Pemasangan, Pengujian & Mulatugas Pelbagai Kapasiti Alatubah Kuasa 132kV Untuk Bahagian Grid, TNB
Engineering, design and supply of RTCC (conventional and digital) for various capacity of Power Transformers
Malaysia
Tenaga Nasional Berhad Hasilwan (M) Sdn. Bhd.
Establishment of PMU 132/33kV Ozana (2x90MVA) Melaka (OZNA), Malaysia
Engineering, design and supply of 132 kV and 33 kV secondary panels, telecontrol equipments and IEC61850 system engineering and integration at PMU 132/33kV Ozana GIS, and retrofitting works at remote ends (PMU 132/11 kV Ayer Keroh, PMU 132/33 kV Metacorp and PMU 132/11 kV Jasin)
Malaysia
Tenaga Nasional Berhad SP&M Sdn. Bhd
Power Transformer (30MVA) Replacement for: Mainhead 1: PMU 132/11kV Nilai, Negeri Sembilan
Engineering, design, supply of 132/11kV DRTCC and retrofitting works of existing 132/11kV Power Transformer CRP at PMU 132/11 kV Nilai
Malaysia
Tenaga Nasional Berhad SP&M Sdn. Bhd.
Power Transformer (30MVA) Replacement for: Mainhead 2: PMU 132/33/11 kV Kangar, Perlis. (Jan 2024)
Engineering, design, supply of 132kV CRP and telecontrol equipment (mix of conventional control panel and digital relay/RTCC for IEC61850 Hybrid RTU system) and retrofitting works at PMU 132/33/11 kV Kangar
Malaysia
Tenaga Nasional Berhad SP&M Sdn. Bhd.
Replacement And Refurbishment Primary And Secondary For Mainhead I: PMU 132/33kV Tikam Batu, Kedah
Engineering, design, retrofitting of 132kV secondary panels and telecontrol equipments at PMU 132/33 kV Tikam Batu and remote ends (PMU 132/33kV Seberang Jaya and PMU 132/33/11 kV Taman Intan) Kangar
Malaysia
Tenaga Nasional Berhad SP&M Sdn. Bhd.
Replacement And Refurbishment Primary And Secondary For Mainhead II: PMU 132/22kV Pasir Gudang Industrial Estate, Johor
Engineering, design, retrofitting of 132kV secondary panels and telecontrol equipments at PMU 132/33 kV Tikam Batu and remote ends (PMU 132/33kV Seberang Jaya and PMU 132/33/11 kV Taman Intan) Kangar
Malaysia
Tenaga Nasional Berhad SP&M Sdn. Bhd.
PMU 132kV Tanjong Gelang (Asset Replacement & Refurbishment Primary And Secondary)
Engineering, design, retrofitting of 132kV secondary panels and telecontrol equipments at PMU 132/33 kV Tikam Batu and remote ends (PMU 132/33kV Seberang Jaya and PMU 132/33/11 kV Taman Intan) Kangar
Malaysia
Tenaga Nasional Berhad Pembinaan Terasmaju Sdn. Bhd.
PMU 132kV Gelang Patah Extension (2 x UGC Bay)
Engineering, design, supply of 132kV secondary panels and telecontrol equipments at PMU 275/132/33/22 kV Gelang Patah
Malaysia
Tenaga Nasional Berhad Pembinaan Terasmaju Sdn. Bhd.
Establishment Of PMU 132/33kV Alam Impian (2x90MVA), Selangor
Engineering, design and supply of 132 kV (digital panels) and 33 kV secondary panels, telecontrol equipments and IEC61850 system engineering and integration at PMU 132/33kV Alam Impian, and retrofitting works at remote end (PMU 132/33 kV Connaught Bridge Power Station)
Malaysia
Tenaga Nasional Berhad Pembinaan Terasmaju Sdn. Bhd.
Establishment of T3 at PMU Batu Kawan South 132/33kV, 1x90MVA In The Distribution Supply Zone of Seberang Perai South, Pulau Pinang
Engineering, design, supply of 132kV CRP (mix of conventional control panel and digital relay for IEC61850 Hybrid RTU system) and 33kV CRP. Also retrofitting works at PMU 132/33 kV Batu Kawan South
Malaysia
Tenaga Nasional Berhad
Supply, Install & Commissioning of RTCC For Grid Maintenance, Grid Division. Mainhead 3 – Southern Bahagian Grid, TNB
Engineering, design, supply, install and commissioning of 132/11 kV Digital RTCC at PMU 132/11 kV Malacca Power Station, PMU 132/11 kV A-Famosa, and PMU 132/11 kV Pasir Panjang
Malaysia
Tenaga Nasional Berhad
Supply, Install & Commissioning of RTCC For Grid Maintenance, Grid Division. Mainhead 4 – Eastern Bahagian Grid, TNB
Engineering, design, supply, install and commissioning of 132/11 kV Digital RTCC at PMU 132/11 kV Maran, and b. PMU 132/11 kV Temerloh Industrial Park
Malaysia

2

2022

Aset Kayamas Sdn. Bhd. Unibrite Electrical Eng. Sdn. Bhd.
Cadangan Pembangunan Perdagangan Di Atas PT 23923 H.S (D) 18603 (Lot Baru 43031), Genting Highlands, Mukim dan Daerah Bentong, Negeri Pahang Darul Makmur
Engineering, design, supply of 11kV control and protection panel at 132/11 kV Genting Ulu Kali
Malaysia
Tenaga Nasional Berhad Pembinaan Terasmaju Sdn. Bhd.
Rehabilitation of PMU 132/33/11 kV Yong Peng (Phase 2), Johor
Engineering, design and supply of 132 kV and 33 kV secondary panels (132kV CRP, 132kV RTCC, 132kV WAIS, 132kV MK, 132kV SIP, 33kV RCP, 33kV Metering Panel) at PMU 132/33/11 kV Yong Peng and retrofitting works at remote ends (PMU 132/11kV Tongkang Pecah, PMU 132/11kV Parit Sulong, PMU 132/11kV Batu Pahat, PMU 132/11kV Muar and PMU 132/11kV Yong Peng North)
Malaysia
Tenaga Nasional Berhad Pembinaan Terasmaju Sdn. Bhd.
Establishment of PMU 132/33kV Kedah Rubber City (2x90MVA), Kedah
Engineering, design and supply of 132 kV and 33 kV secondary panels (132kV DCRP, 132kV RTCC, 132kV WAIS, 132kV MK, 132kV SIP, 33kV RCP, 33kV Metering Panel) at PMU 132/33kV Kedah Rubber City (IEC 61850) and retrofitting works at remote end (PMU 132/33/11kV Tanjong Pauh)
Malaysia
Tenaga Nasional Berhad Grid Power Sdn. Bhd.
Kerja-Kerja Gas Insulated Switchgear (GIS) Refurbishment Di Tiga (3) Buah Pencawang Masuk Utama (PMU) Iaitu PMU Ayer Keroh, PMU Ingerback dan PMU KLIA Bagi Jabatan Grid Maintenance, Bahagian Grid, TNB
Engineering, supply and refurbish of Hyosung GIS Local Control Panel at PMU 132kV Ayer Keroh, PMU 132kV Ingerback and PMU 132kV KLIA
Malaysia
Ragawang Power Sdn. Bhd. MN Power Transmission Sdn. Bhd
50MWac Large Scale Solar Photovoltaic Plant at Tanjung Batu, Mukim Bebar, Daerah Pekan, Pahang
Engineering, design, supply of 132kV and 33kV CRP at LSS Tanjung Batu and 132kV CRP at PMU 132/33 kV Tanjung Batu
Malaysia
Neda Power (Sg. Tiang) Sdn. Bhd. Dekad Aliran Sdn. Bhd.
Design, Supply, Deliver, Install, Testing and Commissioning of a 8 MWac (Nominal) PV Grid Connected System and All Ancilliary Work at Lot 2153, 2154, 2155, 2156, 2163, 2164, 2165, 2173, 2174, 2175, 2185 & 2186 Titi Akar, Mukim Padang Kerbau, Daerah Pendang, Kedah.
Engineering, design and supply of 33 kV underground cable’s control and protection panels at PPU Sg. Tiang
Malaysia
Tenaga Nasional Berhad Hasilwan (M) Sdn. Bhd
Establishment of PMU 275/132kV Paka 3rd SGT (1 x 240MVA), Terengganu
Engineering, design and supply of 275 kV and 132 kV secondary panels and retrofitting works at PMU 275/132/33/11 kV Paka
Malaysia
Classic Solar Farm Sdn. Bhd. MN Power Transmission Sdn. Bhd.
Cadangan Taman Solar Photovoltaic (50 MWac) Di Atas Sebahagian Lot 8431 Mukim Padang Siding, Perlis Untuk Tetuan Classic Solar Farm Sdn. Bhd.
Engineering, design and supply of 132 kV and 33 kV secondary panels
Malaysia
Tenaga Nasional Berhad Pembinaan Terasmaju Sdn. Bhd
Establishment of New PMU 275kV Kenering (AIS), Perak
Engineering, design, supply of 275kV CRP and telecontrol equipment for PMU 275 kV Kenering (IEC 61850) and retrofitting works at PMU 275 kV Temengor & PMU 275/132/33 kV Kuala Kangsar
Malaysia

3

2021

Tenaga Nasional Berhad Mahkota Technologies Sdn. Bhd.
Establishment of New PMU 132/33kV Danga Bay No.1 GIS (2x90MVA), Johor
Engineering, design and supply of substation secondary control and protection system
Malaysia
Tenaga Nasional Berhad UP-WWE JV
Proposed 132kV Bulk Supply Connection to Establish Metal Industries (EMI) Sdn. Bhd. in the Distribution Supply Zone of Rawang, Selangor Darul Ehsan
Engineering, design and site retrofitting for protection panels at PMU Bukit Sentosa
Malaysia
Tenaga Nasional Berhad Rentak Segar Sdn. Bhd.
Kerja-Kerja Replacement of Circuit Breaker ABB LTB145D1 & LTB145D1/BUS for Capacitor Bank Bay – Mainhead A: Grid Maintenance (North), Mainhead B: Grid Maintenance (South) & Mainhead C: Grid Maintenance (KL)
Engineering, design and site retrofitting for control and protection panels at PMU Bukit Tambun (Mainhead A), PMU Senai & PMU Sg. Mati (Mainhead B) & PMU Balakong, PMU Bukit Jalil & PMU Kajang (Mainhead C)
Malaysia
Brunei Fertilizer Industries Sdn. Bhd. Fuji Electric Asia Pacic Pte. Ltd
Engineering Design, Procurement, Construction & Commissioning of BFI 66kV GIS Substation & Power Transformer
Engineering, design, and supply of ZRH transformer explosion proof and fire protection system
Brunei
Brunei Power Company Sdn. Bhd. Hitachi Energy Malaysia Sdn. Bhd.
Engineering Design, Procurement, Construction & Commissioning of Replacement 66kV DES Manggis Substation with 132 (66) kV Hybrid GIS Switchgear Substatio
Engineering, design, supply of substation secondary control and protection panels, substation automation system and ZRH transformer explosion proof and fire protection system

Brunei

Tenaga Nasional Berhad Syarikat Mohamad Salin Sdn. Bhd.
Asset Replacement And Refurbishment For Transformer at PMU 132/33/11kV Chendering
Engineering, design, manufacture, supply of a new RTCC panel and retrofit for132kV CRP and existing RTCC panels
Malaysia
Tenaga Nasional Berhad Universal Peak Sdn. Bhd
Kerja-kerja Relay Replacement Grid 2020 (Phase 5), Bagi Jabatan Grid Maintenance, Grid Division, TNB. – Mainhead B: Grid Maintenance Kuala Lumpur
Engineering, design and retrofitting for 132kV CRP system
Malaysia

4

2020

Tenaga Nasional Berhad Mahkota Technologies Sdn. Bhd.
PMU 275/230 kV Plentong (Phase 2 & Rehab)
Engineering, design, supply, retrofitting of substation secondary control & protection system
Malaysia
Tenaga Nasional Berhad Universal Peak Sdn. Bhd.
Retrofitting Works of Existing Panel for Pilot Wire Protection Scheme Enhancement – Mainhead A (Kuala Lumpur) & Mainhead B (Selangor)
Engineering, design, supply, retrofitting of substation secondary control & protection system
Malaysia
Tenaga Nasional Berhad Respontrade Sdn. Bhd.
Supply of One Unit 90 MVA 275/33 kV as Strategic Spare (Fully Assembled) for Grid Division
Engineering, design, testing and supply new RTCC panel
Malaysia
Tenaga Nasional Berhad Teamchain Electrical Equipment Co., Ltd.
Supply of One Unit 90 MVA 132/33 kV as Strategic Spare (Fully Assembled) for Grid Division
Engineering, design, testing and supply new RTCC panel to Bukit Sentosa Store
Malaysia
Tenaga Nasional Berhad Universal Peak Sdn. Bhd.
Kerja-Kerja Membekal, Memasang dan Memulatugas Sistem Fascia (Anunciator) di PMU Hicom, PMU Puchong Perdana & PMU Bukit Rajah GIS Untuk Unit Automasi dan Perlindungan, Grid Maintenance (Selangor), Bahagian Grid, TNB.
Engineering, design, supply, site retrofitting of substation’s annunciators and transducers.
Malaysia
Selama Hidro Sdn. Bhd. Gecmal Sdn. Bhd
Cadangan Pembangunan Janakuasa Mini Hidro Berkapasiti 9MW di Sungai Selama, Perak
Engineering, design, testing and supply of new 33kV UGC relay & control panel at PPU Kubu Gajah
Malaysia

5

2019

ABB Malaysia Sdn. Bhd.
MYABB-05641816 PPU and SSU Project
RTU’s factory testing and FAT
Malaysia
Multi Impact Sdn. Bhd.
Replacement of Schneider P341 Relay
Engineering, design and retrofitting work (protection relay & scheme) at site
Malaysia
Tenaga Nasional Berhad TransSystem Continental Sdn. Bhd.
PMU 500/275 kV Ayer Tawar Extension
Engineering, design, supply, site modification, installation of secondary Control & Protection panel (CRP)
Malaysia
Tenaga Nasional Berhad Hasilwan (M) Sdn. Bhd.
PMU 132/33 kV Tanah Merah ITC (3×30 MVA to 2×90 MVA), Kelantan
Engineering, design and supply of 132/33 kV CRP and RTCC panels
Malaysia
Recron (M) Sdn. Bhd. – Nilai Plant ABB Malaysia Sdn. Bhd.
Recron (Malaysia) Sdn. Bhd. – Nilai General Plant Tx #3 and Tx #4 Protection Panels Upgrading
Engineering, design, supply, site modification, installation of protection panel
Malaysia
Tenaga Nasional Berhad Bintai Kinden Sdn. Bhd.
Establishment of 132kV Bulk Supply Connection to KTMB Sentul Feeder Station
Engineering, design, supply, site modification, installation of secondary Control & Protection panel (CRP)
Malaysia
Lotte Chemical Titan ABB Malaysia Sdn. Bhd.
MYABB-05641816 Pasir Gudang Primary and Secondary Equipment Upgrading
Engineering, design, supply, site modification, installation of secondary panels (CRP, Marshalling Kiosk etc)
Malaysia
Tenaga Nasional Berhad Universal Peak Sdn. Bhd. – WW Eng. & Construction Sdn. Bhd. JV
Replacement of Schneider Electric P123 OCEF Relay at PMU Kelemak, PMU Salak Tinggi and PMU New Senawang
Engineering, design and retrofitting work (protection relay) at site
Malaysia

6

2018

Tenaga Nasional Berhad Mega Linear Sdn. Bhd.
Replacement of 132kV Primary and Ancillary Equipment for PMU 132/11 kV Muar, Johor
Retrofitting work (protection relay & scheme) at site
Malaysia
Tenaga Nasional Berhad IPRO System Sdn. Bhd
AVR Relay Retrofitting of Existing RTCC for 132/33 kV Transformer No. 3 (T3) & No. 4 (T4) for PMU Panchor 132/33 kV
Retrofitting work (RTCC and AVR) at site
Malaysia
Electricite du Laos (EDL) PP Electric Sole Co., Ltd.
Supply of 22 kV NER to EDL Savannakhet Substation
Design & supply of 22kV NER

Laos

Cambodian Transmission Limited
North Phnom Penh – Kampong Cham Transmission Project
Design & supply of WebCAN RTU

Combodia

Sarawak Energy Berhad Consortium GE Power Services and Fook Lai
Serudit 275/132/33 kV Substation Project
Design & supply of switchyard’s lighting distribution board and junction box
Malaysia

ABB Malaysia Sdn. Bhd.

MY05641806 PPU and SSU Project
RTU’s factory testing and FAT
Malaysia

vol

Year

PROJECT Name

Project Title

Brunei Fertilizer Substation
Supply and Delivery of complete set for Transformer Nitrogen gas Explosion and Fire Prevention system

1

2021

66kV DES Brunei Manggis Substation
ZRH Transformer Explosion and Fire Prevention System

vol

Year

PROJECT Name

Project Title

1

2022

Pilot Wire Retrofitting – Mainhead A (KL) & Mainhead B (SEL)
Retrofitting Works of Existing Panel for Pilot Wire Protection Wire Scheme Enhancement – Mainhead B (Selangor)
Pilot Wire Retrofitting – Mainhead A (KL) & Mainhead B (SEL)
Retrofitting Works of Existing Panel for Pilot Wire Protection Wire Scheme Enhancement – Mainhead A (Kuala Lumpur)
LSS3 Kuala Muda Solar (Primary Engineering)
LSS3 KUALA MUDA Solar Interconnection Project (Primary Engineering Services)
PASCORP Paper Industries 33kV/11kV Substation
Provide cable block diagram and cable termination diagram
275/33kV Serudit Substation Project (Engkilili Site)
Secondary Engineering and Site Support

2

2021

Replacement of CB ABB LTB145D1 & LTB145D1/BUS for CAPBANK
MAINHEAD B: GRID MAINTENANCE (SOUTH)
Replacement of CB ABB LTB145D1 & LTB145D1/BUS for CAPBANK
MAINHEAD A: GRID MAINTENANCE (NORTH)
132kV DESHON Substation CB replacement
Site Modification & Supervision

3

2020

Pilot Wire Retrofitting – Mainhead A (KL) & Mainhead B (SEL)
Retrofitting Works of Existing Panel for Pilot Wire Protection Wire Scheme Enhancement – Mainhead B (Selangor)
Pilot Wire Retrofitting – Mainhead A (KL) & Mainhead B (SEL)
Retrofitting Works of Existing Panel for Pilot Wire Protection Wire Scheme Enhancement – Mainhead A (Kuala Lumpur)
LSS3 Kuala Muda Solar (Primary Engineering)
LSS3 KUALA MUDA Solar Interconnection Project (Primary Engineering Services)
PASCORP Paper Industries 33kV/11kV Substation
Provide cable block diagram and cable termination diagram
275/33kV Serudit Substation Project (Engkilili Site)
Secondary Engineering and Site Support

4

2019
Gemas – Johor Bahru Double Track Electrified Project SDT
Electrification for SDT from Gemas to Johor Bahru
Gemas – Johor Bahru Double Track Electrified Project SDT
BIM Services for Overhead Catenary System and Traction Power System
LSS Keteri Engineering Service
Propose Development Of 30mwac Large Scale Solar Photovoltaic Plant Development At Mukim Chuping, Bukit Keteri, Perlis, Malaysia
Rantau Biogas Plant Schneider P341 Relay Configuration
Schneider MICOM P341 Site Technical Support

vol

Year

PROJECT Name

Project Title

1

2023

TNB ICT SI
UTILITY SDH PHASE 7 – GM SOUTH
TNB ICT SI
Communication Services
TNB ICT SI
UTILITY SDH PHASE 7 – GM SOUTH
TNB ICT SI
SIPP Data Center (TNB)

2

2022

PMU 275/32/11kV Bridge Data Center, Kulai Johor
Supply, install and commission of ICT Telecommunication Equipment for Bridge Data Center Substation
LSS4 Bukit Selambau
Supply and Install ICT Equipment for TBSS2 SPPIF & PMU Bukit Selambau
Eastern Steel Substation
Supply, install and commission of ICT Telecommunication Equipment for Eastern Steel Substation
LSS4 Bidor
Supply, install and commission of ICT Equipment for LSS4 50MWAC Bidor
LSS4 Bidor
Supply, install and commission of ICT Telecommunication Equipment for Bidor Substation
EMI ICT
Supply, install and commission of ICT Telecommunication Equipment for EMI Substation
TNB ICT SI
Operation TDM Traffic Services Improveme
TNB ICT SI
UTILITY SDH PHASE 6 – GM SOUTHERN

3

2021

Hanwha Qcell substation
Supply, Install and Commission of ICT Telecommunication Equipment for Hanwha Qcell substation
LSS Coara Marang
Supply, Install and Commission of ICT Telecommunication Equipment & System for LSS Coara Marang
Micron 132kV Substation
Supply, Install and Commission of ICT Telecommunication Equipment for Micron Substation
LSS3 Kerian Substation
Supply and install Oring IDS-312L Serial to Ethernet Converter
LSS3 Kerian Substation
Supply, Install and Commission of ICT Telecommunication Equipment for LSS3 Kerian
LSS2 Danau Tok Uban
Supply, install and commision of ICT Telecommunication Equipment for LSS2 Danau Tok Uban
WD Sandisk Substation, Batu Kawan
Supply, install and commission of ICT Telecommunication Equipment for Sandisk substation
PMU Sg. Kechil
Supply, install and commission of ICT Equipment for LSS4 JAKS SOLAR
PMU Sg. Kechil
Supply, install and commission of ICT Equipment for LSS4 JAKS SOLAR

4

2020
LSS3 Kuala Muda Solar (Telecommunication)
LSS3 Kuala Muda Solar Interconnect Project – Substation Communication (Engineering Design and Deliverables)
LSS3 Kuala Muda Solar (Telecommunication)
LSS3 Kuala Muda Solar Interconnect Project – Substation Communication (Engineering Design and Deliverables)
LSS3 Kuala Muda Solar (Telecommunication)
LSS3 Kuala Muda Solar Interconnect Project – Substation Communication
36kV Selama Hydro – TNB PPU Kubu Gajah
Supply, install and commission of internet solution for Kuala Kubu Gajah for Extension
36kV Selama Hydro – TNB PPU Kubu Gajah
Supply, Install and Commission of Internet Solution for Kuala Kubu Gajah